A galley kitchen from 1998 became the room this family never leaves — nine weeks, one crew, no surprises along the way.
Saved to a phone in 2019. Never made it off the lock screen — until now.
Every trade, one crew.
Nothing subcontracted out of sight. Every trade below was measured, built, and finished by the same hands that walked the final punch list.
Nine weeks, phase by phase.
A remodel skips land and permitting — everything else runs the same disciplined sequence as a ground-up build.
Skipped for this remodel — no new footprint, no permit required.
Measure, design, material selection, client sign-off.
Demo through install — one crew, start to finish.
Detail clean, final walkthrough, punch list closed.
The Martinez Standard begins the day we hand over the keys.
What it actually took.
We had a picture saved on our phone for three years. Hector didn’t just match it — he built the exact room, down to the hardware. Nine weeks, and it was like we’d always lived here.